The inrush power required
to initiate the locking solenoid is approximately
56 VA for 0.1 seconds. If several switches are installed
in parallel, the combined energy requirements for
these units is considerable and may cause an excess
burden to the power supply. To elevate this problem,
the 24 Volt versions of the FS solenoid locking switches
have a built in millisecond time delay for the activation
of the solenoid. This delay can be configured into
4 ranges, that are set through two internal dip switches.
Setting the time delay will sequence the inrush demands
of the solenoid, reducing the demands on the power
supply.